Choose a schedule
Saving an Immediately workload or an already-due schedule can create work. Keep tutorials Manual until you deliberately enable scheduling.
Schedule the orders example
- Open Your first workload and verify one manual run.
- Edit its schedule. Choose Fixed interval and enter 300 seconds with your chosen start time.
- Choose Wait for overlap and Run once for missed runs.
- Save, then inspect the next due time.
- After a due boundary, confirm a scheduled run exists and reaches a final state.
Use cron deliberately
Laminar cron expressions include a seconds field. These examples use six fields:
Set a named schedule time zone such as
UTC or Asia/Kolkata. Validate the expression and inspect the next due time. Do not paste a five-field expression from another scheduler and assume the meaning is unchanged.
Separate three clocks
UTC is useful for the first examples. Calendar schedules in zones with daylight-saving changes can have different elapsed durations between boundaries. If elapsed duration matters, choose an interval or inspect the actual window bounds rather than assuming every day is 24 hours.